After the caulking material has hardened, install the casing to cover the spaces between the jamb uprights, header and the walls with finishing nails on a maximum 24" (60,96 cm) centers. See figure #5. The nails should be of a length that gives a penetration into the frame of at 1/2" (1,27 cm).
0Figure #50 Install the door in the jamb
Certified fireproof door
Steel hinges 4" x 4-1/2" x 0.134" (10,16 cm x 11,43 cm x 0,34 cm)
#10 screw, 2-1/4" (5,72 cm) long, at each hinge and strike
Casing, either solid wood or veneer covered MDF
Finishing nail