HB&G Manufactures Our Products From Long-Lasting Materials That Are Easy To Install and Require Little Maintenance.
540
100
100
360
75
75
PermaCast® Plus
240
50
50
Replacement
Replacement
180
15
15
120
Wood Products
Foam/Poly Materials*
10
10
90
Finishing Time
PermaCast® Plus PermaLite® Installation Time Finishing Time
5
5
60
HB&G PermaWrap® Products
Installation Time
Wood Foam/Poly Material
PermaWrap®
1
1
35 30 HB&G PermaCast® and PermaLite® Products 40 45 50 100 200+
5
10
15
20
25
YEARS OF STRUCTURAL INTEGRITY
Includes all tasks required by manufacturer to meet warranty requirements.
Years of Structural Integrity
*Not Load Bearing *Not Load Bearing
Looking for an Uplift Solution?
Look no further than
from
Perma-Loc® Uplift Anchoring System
• 4,200 lb strength galvanized aircraft cable combined with 316 stainless steel marine-grade attachment hardware for optimal uplift resistance. Exceeds the required capacity for 1,000 lb. uplift • Perma-Loc® eliminates the need to split a column, along with all of the labor and material costs associated with splitting and re-joining two column halves • All hardware is included for concrete substrate applications and are available in three sizes: up to 12', 16', and 20' lengths • Extremely cost-effective and versatile application that covers the entire spectrum of HB&G load-bearing products • Patented design accompanied by certified/stamped engineering documentation. Florida Department of Business and Professional - Regulation approved #37300
5
Powered by FlippingBook